AI is an organizational stress test

You don’t adopt AI into your processes. You redesign your processes around AI.

Three red industrial valves on insulated steel pipes, each feeding a blue pump.

What do AI and piping systems have in common?

Piping stress analysis

the process of analyzing a piping system so that it is strong enough to support internal and external loads during its life in use.

Engineers do stress analysis on a piping system to see whether it can take the load it is going to operate under without breaking.

AI will do something similar to your company when you try to “adopt” it.

AI increases the volume and speed of work for every worker, team and department. It produces massive amounts of data 24/7 and in doing so exposes the friction that already exists inside the organization: teams not talking to each other, handoffs broken, duplicated work, slow processes, inconsistent ways of working, undocumented processes, critical knowledge only in someone’s head.

It also shows organizational bottlenecks that may have been tolerable before AI: multiple layers of management; too many people involved in decisions, days or weeks to get approvals; dependence on a single person/team to keep work moving.

These things may not have been efficient but they were manageable when the organization was moving at human speed.

AI changes the equation.

When one person with the right AI tools and context can produce in a few days what it would have taken a team weeks to do, suddenly bottlenecks around that person are impossible to ignore.

There’s not much point in being able to crank out work ten times faster if it still takes two weeks to get a decision approved.

And there is little value in giving your employees powerful AI tools if the organization around them is still designed to run at yesterday’s speed.

It’s like pouring water through a pipe at high pressure and seeing where it leaks first. When you put AI into your existing processes and ways of working you quickly start to see where the roadblocks are: bottlenecks, handoffs between teams, dependencies and inefficiencies that are stopping the organization from moving faster.

If you’re a leader, manager or responsible for any non-trivial workload then you probably already asked yourself: Why are we spending so much money on AI products and tokens but I don’t see the impact reflected in our business or productivity metrics?

The reason is simple but the answer isn’t.

You don’t adopt AI into your processes. You redesign your processes around AI.

AI is not something you can retrofit onto an existing process and suddenly expect to move ten times faster.

The problem is that many processes work today not because the process itself is good but despite the process. They work because experienced people know how to navigate around inefficiencies. Who to call, what shortcuts to take, which exceptions to ignore and where the information is. Sometimes critical knowledge exists only in one person’s head. Sometimes it’s tribal knowledge that hasn’t been written down. Sometimes the process is held together by years of experience and informal workarounds.

That might work when humans are doing the work.

It doesn’t work nearly as well when you introduce AI agents.

Agents love work that is consistent, predictable, repeatable, deterministic and standardized. They need clear inputs, clear rules, information accessible to them and predictable outputs.

The real opportunity isn’t simply to automate the process you have today. It’s using AI to rethink the process itself, sometimes we want to improve a step, process or workflow that shouldn’t be there in the first place. Remove unnecessary steps, eliminate bottlenecks, standardize work, make knowledge accessible and redesign workflow so humans and AI can operate at much higher speeds together.

A normal sprint on an engineering team

Let’s take a typical engineering team at a typical company.

They work in two-week sprints. They track their work in JIRA, Linear or something similar. They have the usual sprint ceremonies that if you’ve worked in engineering you know by heart.

Planning. Estimation. Story points. Capacity. Velocity. Burn-down charts. Daily stand-ups. Retrospectives. Everything.

Your engineering manager tracks the metrics, JIRA has dashboards, your company has internal tools to track developer experience. Every month or quarter you sit down with management and present the team’s numbers.

How are we doing? How fast are we moving? How predictable are we? Are we hitting our commitments?

And God forbid someone adds a ticket halfway through the sprint. Because if work is being added in the middle of the sprint then apparently we have a planning problem. Or an estimation problem. Or a capacity problem.

So you estimate a bunch of tickets, assign them to the sprint and for the next two weeks that’s what they are. You made a plan and now you’re largely tied to it except on-call or some incident work might come up. That model worked when the fundamental when was a human working on a task.

AI changes that assumption.

So what exactly are we estimating?

A task might be a 5 for me. What is it for an AI agent? Maybe 1 or less.

Capacity of whom?

For a human capacity is measured in hours, focus and availability. For an AI agent capacity is much closer to how much compute and tokens you are willing to spend.

That fundamentally changes the economics of the system.

So if your thinking is:

“Great. We’ll keep working exactly as we do today, but now engineers have AI assistants. Hopefully, everyone gets a little more productive.”

And they might.

But you are not going to get an order-of-magnitude improvement or any meaningful improvement from the previous way of working. It might even slow you down a bit until you get used to the tools (or at least adapt).

The 30-minute task that takes 30 hours

Let’s say there is an engineer working on a ticket.

With AI they get the implementation done in 30 minutes. They open a merge request.

Great. AI just saved hours of engineering time.

Your repo needs 2 approvals before it can be merged. So now you wait.

You message someone on Slack or Teams. Maybe they’re in a meeting. Maybe they’re working on something else. Maybe they have other merge requests to review.

They say:

“I’ll take a look this afternoon.”

The afternoon comes. You get the first review.

Now you need another one.

Maybe the second reviewer sees it next morning. You go through your daily stand up and say you’re still waiting for a review.

Eventually, you get the second approval.

It’s been roughly 24 hours.

Maybe there are changes requested. You make them, push the new code and depending on your repository rules suddenly you need approvals again because new commits invalidate previous reviews (and so on).

So you wait again.

Eventually (lunch time perhaps), the merge request is approved and merged.

The actual implementation took 30 minutes. Time from start of work until into the codebase was 30 hours.

And sometimes it’s two days. Or three.

So what did you get for spending $20 on API calls to have an AI agent implement the ticket in 30 minutes?

You sped up the work. You didn’t speed up the system. Just because you’re faster individually doesn’t mean you’re collectively more productive.

And this is where “adding AI” to an existing organization starts to fall apart.

AI can speed up the rate at which work is produced (lines of code in this case). But if the rest of the organization still operates at the same speed approvals, reviews meetings handoffs prioritization dependencies decision making then you’re still tied to the same delivery pace as before.

But now you have more time to work other things

So you explain this to your manager or leadership and they say:

“Ok but if you do a task in 30 minutes then you have more time to work on other things”.

Sure, I would have. But remember I already estimated the work of this sprint. If I want to pick another ticket from the famous Backlog I can’t. Actually, you might get a message from your manager:

“Why are you pushing things to the sprint in the middle of the sprint? This messes up with the metrics we can’t do…”

I’m sure i can’t be the only one who got this message already during their career, so now i have more time but you are still working on old ways of working, still paying more attention to metrics than just moving forward.

AI plans better than humans

You walk into a planning session.

A developer is asked:

‘How many tickets do you think we need for this feature?’

he thinks for a bit and says:

‘I think we need two for the backend and one for the front end.’

This is an estimation based on how much context he has in his head about a repo or project he’s working on, and his experience. He’s estimating how much work he expects to have to do.

Now he starts working on the task, not doing it himself (he prompts the agents to do it).

The agent plans the work, looks at the code base (frontend and backend) takes ten minutes to understand what will need to happen then comes back with a great step by step implementation plan.

You approve it, and the agent implements it. You’re happy with the results and give it another instruction,

‘Create easy to review stacked merge requests, organized in a coherent and logical manner for a human to review.’

The agent comes back with five, perfectly stacked merge requests, organized and focused so a human can review them easily.

But now we have a problem you said, this would take three tickets two for the backend one for the front end.

Your team has a policy that every ticket needs to have a merge request, but now you have five MRs and 3 tickets.

Each merge request needs to reference a ticket number. What do you do?

Or maybe the inverse problem: you have a lot of tickets (5), but only three merge requests; instead the agent decomposes implementation into three merge requests.

You were planning for people and implementing with agents. An agent can probe a code base fast enough with enough context to reorganize how work gets decomposed naturally (maybe even find out that way a person would break down work isn’t the best way anymore).

Instead of letting the implementation drive the work I was trying to force agent produced work into previous processes.

Final thoughts

So, if I’m a manager, where do I start?

Start experimenting with your team. It doesn’t matter if we’ve been doing the same planning sessions, ceremonies, rituals and processes for the past decade already.

Instead, try something different next month. Start from scratch.

For example plan the work with agents. Write a PRD for what you want to get done in the next week and have an agent help you break it down into dependencies and a plan.

Organize the work into waves and hand them off to developers and think about pairings for each wave. Keep PRD as source of truth and track it in Confluence, GitHub or whatever you use already as source of truth.

Keep using the tools you know and ask the agent to write up the tickets. Epics for waves in Jira or Linear. Break work down week by week.

Use Claude Code, Codex, Cursor, Grok or whatever works best for your team to plan that work; build it; review it; test it and iterate on it.

The point isn’t to find the right way. The point is to find ways to experiment.

We are in a different era of software development. The way teams operate, plan, build, review and ship is changing. As a manager you have to figure out how your team can do that better now.

Given the agents can plan meaningfully valuable parts of the work? How do you give your developers more leverage without losing visibility? How do you move fast and know what you ship is good enough? How do you understand what your team is doing? How do you avoid bottlenecks? How can I move faster while maintaining a high bar?